P&R Infraprojects Ltd. offers the services for design, fabrication, painting, erection, testing and commissioning of the structural steel works for specialized structures of:-
- Steel bridges- Foot Over Bridges (FOB), Rail Over Bridges and Road Over Bridges (ROB), Canal Over Bridges, etc.
- Flyovers and Grade Separators
- Roofing for stadiums and swimming pools
- Frame structures of towers and pylons
- Tankages, piping and water conductor systems
All our works are executed to meet highest standards of quality of international levels.
The various stages involved in the designing of a steel superstructure has been explained below:
1) Design : We make it Easy for You
The design team of P&R consists of engineering professionals, construction experts and project estimators to meet all the requirements for the construction of the project. The group’s experts and experience allows it to meet the tight deadlines to complete the projects in stipulated time frame with quality standards set by ASME,RDSO & ISO.
2) Estimate : Locked In and Guaranteed Pricing
Once the design drawings of the project are finalized, the engineering team will determine the Bill of Quantities (BOQ) and prepare the estimated time taken and costing of the project. The team makes sure to make most of the raw material by reducing the wastage to the minimum levels. Estimation expertise enables P&R to stay ahead of the project schedules, manage cost and prepare the project financing.
3) Engineering : Precision Specifications
After the estimation and planning of the structure,the technical services department of P&R completes the detail engineering of the project which includes preparing quality manual for fabrication, fabrication drawings, erection methodology, any detail calculations required for successfully launching the superstructure and getting approval from the same from the concerned departments.
4) Build : Quality Construction
The timely completion and accuracy of fabrication of steel superstructure is critical to P&R while maintaining the quality standards of ASME,RDSO & ISO. The group’s highly proficient team at workshop and various work sites are experts in their relative fields. Also, P&R has highly advanced machinery which ensures high output in minimal time yet utilizing very less work force.
MAJOR PROJECTS
Jai Prakash Narain International Centre (JPNIC), Lucknow., Uttar Pradesh
Client : Lucknow Development Authority (LDA)
Status : Completed
Description: Supply, Fabrication and Installation of Tubular Steel Arch Trusses & Other Associated Steel Structures
Arch Steel Bridge Over River Wahrew, Tharia, Meghalya
Client : Public Works Department (PWD)- Meghalaya
Status : Completed
Description: Strengthening, Improvement including Metalling and Blacktopping of 6.125 km Road from Bholaganj to Nongjri including Construction of Major Bridge of 169.35 m Span
Jawaharlal Nehru Stadium, New Delhi
Client : Shapoorji Pallonji & Co. Ltd.
Status : Completed
Description: 9000MT of 3D flexible structure as a part of the renovation & new construction of the stadium for The Commonwealth Games ’10, Delhi
Indira Gandhi Cycling Velodrome, New Delhi
Client: JMC Projects (India) Ltd.
Status: Completed
Description: Supply, fabrication and erection of 2007 MT of steel arch and trusses for Velodrome, in preparation for the Commonwealth Games ’10, Delhi
Thyagraja Netball Stadium, New Delhi
Client: JMC Projects (India) Ltd.
Status: Completed
Description: Fabrication & Erection of 3227MT of Steel Trusses for Thyagraja Netball Stadium, in preparation for the Commonwealth Games ’10, Delhi
Foot Over Bridges, Jawaharlal Nehru Stadium, New Delhi
Client: Public Works Department- Delhi
Status: Completed
Description: Construction of 2 Steel Suspended Arch Bridges-weighing 600MT, in preparation for the Commonwealth Games ’10, Delhi
Rail cum Road Bridge, Begusarai (Munger), Bihar
Client: Gammon India Ltd.
Status: Completed
Description: Fabrication, Painting & Cantilever Erection work of Rail cum Road Bridge
Construction of Educational Building at IIT-Ropar
Client: ITD Cementation Ltd/CPWD, Ropar
Status: Completed
Description: Supply, Fabrication and Erection of Structural steel work and ancillary Work.
440 m Span Dobra-Chanti HMV Suspension Bridge, Distt. Tehri Garhwal, Uttrakhand
Client: IPublic Works Department- Uttrakhand
Status: Ongoing
Description: 3000 MT of Structural Steel plus Supply & Erection of 348 No. of Hangers suspended from Main Cable with additional supply of Catwalk