S.No | Name Of Project | Details of Works | Client |
---|---|---|---|
1 | 66 KV Double Circuit Transmission Line from 9 MW Dah HEP to 9 MW Hanu HEP Switchyard and from Hanu Switchyard to 66/11 KV Substation Khaltsi (Leh) | Design, Engineering, Manufacture, Supply, Erection, Testing and Commissioning of 66 KV Double Circuit Transmission Line from 9 MW Dah HEP to 9 MW Hanu HEP Switchyard and from Hanu Switchyard to 66/11 KV Substation Khaltsi (Leh) through Engineering, Procurement & Construction Mode (Approx. Line Length 63.40 Kms) | Jammu & Kashmir Power Development Corporation, Boulverd, Srinagar (J&K) |
2 | 9 MW Hanu SHEP, Jammu and Kashmir | Civil Works for Hanu SHEP | Jammu & Kashmir Power Development Corporation, Boulverd, Srinagar (J&K) |
3 | 9 MW Dah SHEP, Jammu and Kashmir | Civil Works for Dah SHEP | Jammu & Kashmir Power Development Corporation, Boulverd, Srinagar (J&K) |
4 | 9 MW Hanu SHEP, Jammu and Kashmir | Construction of 9 MW Hanu SHEP on EPC Turnkey Basis | Jammu & Kashmir Power Development Corporation, Boulverd, Srinagar (J&K) |
5 | 9 MW Dah SHEP, Jammu and Kashmir | Construction of 9 MW Dah SHEP on EPC Turnkey basis | Jammu & Kashmir Power Development Corporation, Boulverd, Srinagar (J&K) |
6 | Small Hydroelectric Plantof capacity 10MW (2x5MW) | Turnkey execution of Construction of Kahmil Small Hydroelectric Plantof capacity 10MW (2x5MW) | Jammu & Kashmir Energy Development Agency (JAKEDA) |
7 | Dringla Karnah Small Hydroelectric Plant of capacity 10MW (3x3.33 MW) | Turnkey execution of Construction of Dringla Karnah Small Hydroelectric Plant of capacity 10MW (3x3.33 MW) | Jammu & Kashmir Energy Development Agency (JAKEDA) |
S.No | Name Of Project | Details of Works | Client |
---|---|---|---|
1 | Guru Hargobind Thermal Power Project, Lehra Mohabbat, Bathinda | Fabrication & Erection of Structural of Main Plant Builing Coal Bunkers, Fuel oil Tanks, chimney, cooling Towers, Pipes racks etc. for 2 x 210MW Thermal Power Plant | TSL/NBCC/PSEB |
2 | Trident Group Varindra Agro Chemical Ltd. (Paper Div.) Barnala (Pb.) | Fabrication & Erection of Boiler, ESP and Bunker structure and complete Erection of Boiler pressure parts and ESP | Trident |
3 | Fabrication & Erection of plate girder of 2 railway spans (1x55 M & 1 x 50M) of ROB No.5/PNB at KM 111+444 on NH-1A at Pathankot at Punjab | Fabrication & Erection of plate girder of 2 railway spans (1x55 M & 1 x 50M) of ROB No.5/PNB at KM 111+444 on NH-1A at Pathankot at Punjab | IRCON International Ltd. Plot No.C4, Distt. Centre Saket New Delhi -110017 |
4 | Fabricaion and erection steel bridge, built up sections for Kurali -Kiratput N.H. 1 Package II | Fabricaion and erection steel bridge, built up sections for Kurali -Kiratput N.H. 1 Package II | S.P. Singla Construction Pvt. Ltd. Kothi No.47, Sector 9, Panckula - 134113, Haryana Ph# 0172-2571595,2570440 Fax30172-4620941 |
5 | Erection of PEB at Zirakpur | Erection of PEB at Zirakpur | ERA Group,B-24,Sector - 3,noida |
6 | ROB at Ropar | Transportation,Erection and placing of PSC girders for ROB at Ropar | BSC-C&C 'JV' Plot No-70,Sector - 32,Gurgaon-122001 |
7 | Mukerian Hydel Project Stage - II | Construction of balance work comprising of part of head & trail race channel, power house building, trash rack, intake, draft tube, intake & draft tube gates & all allied protection work of Mukerian HEP Stage - II | Punjab State Power Corporation Limited |
8 | Mini Hydel Project Gurdittiwala 2 MW | Development of Mini Hydel Project Gurdittiwala RD 55413 (2.00 MW Capacity) on Ferozepur Feeder on Building Operate & own (BOO) Basis under state NRSE Policy - 2012. | Punjab Energy Development Agency |
S.No | Name Of Project | Details of Works | Client |
---|---|---|---|
1 | Malana Hydro Electric Power Project, JARI-HP | Rehabilitation works of reservoir of MPCL HP Civil works -P.O. JARI - Distt, Kullu (H.P.) | MPCL |
2 | 12 MW Khauli Hydro Electric Project, Vill. Shahpur , Distt. Kangra (HP) | Supply, Fabrication and erection of MS Pipe for Khauli HEP (12MW) located near village Darini, Distt. Kangra (H.P.) | HPSEB |
3 | Larji HE Project, Vill Thirot, Distt. Kullu, HP | Penstock for Larji Hydro Electric Project Dia = 4.5 meter | HPSEB |
4 | Baragran Hydro Power Project Limited | Civil works of 2x 1.5MW Baragran HEP of KKK Hydro 14/5 Mathura Road Faridabad - 121003 | LOI No. KKK 126 Dt.14.03.2002 |
5 | 12 MW Khauli Hydro Electric Project, Vill. Shahpur , Distt. Kangra (HP) | Penstock for Khauli Hydroelectric Project (12 MW) complete with accessories including civil works | HPSEB |
6 | 12 MW Khauli Hydro Electric Project, Vill. Shahpur , Distt. Kangra (HP) | Constrcution of Power Channel (Box section ), forebay and Penstock tunnel complete in all respects for Khauli HEP (12MW) located near village darini, distt Kangra (HP) | HPSEB |
7 | 3 MW Aleo Manali Project | Supply & Installation of Penstock, Power Pipe and all cicil works for diversion structure, Desilting tank, forebay etc. for 3 MW ALEO Manali Project | M/sALeo Manali Hydro Power Pvt. LTd. |
8 | Malana Hydro Electric Power Project, JARI-HP | Design, Fabrication & Erection of penstock 2.2 m dia Penstock, Steel Liner and related Civil Works of Malana Hydro Electric Power Project-JARI, Distt. Kullu (H.P.) | MPCL |
9 | Motighat S.H.E.P 2X2.5MW | Fbrication,Supply,Erection,and Hydro Testing of Penstock for Motighat S.H.E.P 2X2.5MW | Himalaya Hydro Private Limted,8&9,Achuta Cooperative Society,Road No- 10,Banjara Hills,Hyderabad-500035 |
10 | Sorang Hydro Electric Project | Fabrication & erection of Penstock from upper end of Bend 12 to the upstream end of the existing Y-Bifurcation. | Sorang Penstock HPP Consortium |
11 | 9112-Construction of Coffer Dams, Diversion Tunnel, Concrete Dam including Spilway, Power Intake for Bajoli Holi HEP | Supply, Fabrication, Erection & Commissioning of Diversion Tunnel Gate (P&R Infraprojects 9112/62) | Gammon India Limited |