The shop is equipped with most modern machinery and the plant possesses NDT techniques of Radiography, Ultrasonic Examination, DPT, MPT and various other instruments to measure standard of surface cleaning by sand blasting and measurement of thickness of paints.
The different types of machinery which the company has in its possession currently are given below:
S NO. | MACHINE TYPE | QUANTITY |
1 | Crane | 11 |
2 | H-Beam Assembler | 1 |
3 | H Beam Straightener | 1 |
4 | DG Set | 6 |
5 | Air Compressor | 7 |
6 | Welding Machine | 43 |
7 | Weld Handy Multi TS Strong | 6 |
8 | CNC Cutting Machine | 2 |
9 | Automatic Gas Cutting Machine | 1 |
10 | CNC Drill Machine | 3 |
11 | Lathe Machine | 1 |
12 | Drilling Machines | 29 |
13 | Hydraulic Press With Power Pack | 1 |
14 | Saw M/c With Asser | 14 |
15 | Grinding Machine | 83 |
16 | Pug Machine | 22 |
17 | EOT Crane 20 T | 4 |
18 | Electrical Pannel | 3 |
19 | Machanical Jack | 3 |
20 | Chain Block | 6 |
21 | Impact Wrinch | 4 |
22 | Chain Pully | 18 |
23 | Turn Buckle | 6 |
24 | Max Puller Cap. 5 Ton | 3 |
25 | Trailor | 1 |
26 | Torque Wrinch | 3 |
27 | Air Compressor Tank | 2 |
28 | Magnet Lifter 2 Ton | 1 |
29 | Hyd. Jack 750 T | 4 |
30 | Hyd. Jack | 18 |
31 | Power Pack | 9 |
32 | Other Vehicle (Van,Jeep,Ambulace Etc.) | 4 |
Fact File
- Location: Rupnagar (Ropar), Punjab
- Total area: 21 acres (approx.)
- No. Of Bays: 2
- Area per Shed: 5000 m sq.
- Manpower: 300
- Electrical Power Supply: 600 kW
- Output capacity: 1000 MT per month
- Maximum Girder Length Fabrication Capacity: 12m
- Maximum Dimension Built: (1500 x 800 x 6745) mm
- Single Unit Maximum Weight Handled: 20 MT (Box Girder)
- Maximum Plate Thickness Handled: 50mm
- Welding Types Used: SAW, SMAW, MIG
- Material Used: High Tensile Steel E410 B0 cu, E250 B0
- Recognized & approved by Government agencies like ASME, ISO, Research, Design & Standards Organization(RDSO) of Indian Railways-Lucknow
- Automatic H-Beam fabrication plant with capacity of 18000 mm
- Auto-assembly lines for Box and I-Girders
- Present work to be completed in the next years is to the tune of INR 1000 million